Whole-Home Renovation in Palm Beach County: The Process From Plan to Move-In

By North2South Renovations. Updated October 29, 2026.

Whole-home renovation with a shiplap ceiling, new wide-plank floors and an open kitchen beyond

A whole-home renovation isn’t one big project. It’s dozens of smaller ones, kitchens, baths, floors, electrical, plumbing and sometimes walls, that all have to happen in the right order. When the sequence is right, the job feels calm and predictable. When it isn’t, trades wait on each other and the budget leaks.

In Palm Beach County, the process has a few local layers: condo and HOA approvals, flood-zone rules, hurricane-rated windows and doors, and a new Florida Building Code arriving at the end of 2026. This guide walks through the whole process, from the first walkthrough to move-in day.

Key Takeaways

  • Expect months, not weeks. Angi puts the average whole-house renovation at two to eight months of work, and design and permitting come before that.
  • Budget by scope. National averages run about $15 to $60 per square foot, premium finishes can top $150 per square foot, and older homes often start around $100,000 because of system upgrades.
  • In a FEMA flood zone, work costing 50 percent or more of the structure’s value can require bringing the whole house up to current flood standards.
  • Florida law protects you: contracts over $2,500 must include the Construction Recovery Fund notice, and jobs over $5,000 need a recorded Notice of Commencement.

The whole-home renovation process at a glance

  1. Walkthrough and goals

    You walk the house with your contractor, talk through priorities and identify anything that needs a closer look.

  2. Scope and budget

    The project is defined room by room, with a budget range and a contingency for surprises.

  3. Design and selections

    Layouts are finalized and finishes, fixtures, cabinets and appliances are chosen before construction starts.

  4. Approvals and permits

    Plans go to your condo or HOA if needed, then to the building department for permits.

  5. Ordering and scheduling

    Long-lead items are ordered and trades are scheduled in sequence.

  6. Demolition and discovery

    Finishes come out, and hidden conditions behind walls and under floors are addressed.

  7. Rough-in and inspections

    Framing, plumbing, electrical and HVAC changes are made and inspected.

  8. Closing up

    Insulation, drywall and other inspections happen before finishes go in.

  9. Finishes

    Cabinets, tile, flooring, trim, paint, fixtures and appliances are installed.

  10. Final inspections and punch list

    Permits are closed, and you walk through every room to list final touch-ups.

  11. Move-in and warranty

    You get warranties, manuals and a clear point of contact for anything that comes up.

Step 1: Define your goals and budget

Start with what you want the house to do differently: open up the kitchen and living areas, add a bathroom, make the home safer to age in, or simply replace finishes that are 25 years old. Those goals drive the scope, and the scope drives the budget.

National cost guides give a useful frame (Angi):

ScopeWhat it typically includesNational cost guide
Light refreshPaint, fixtures, some flooring, minor repairsStarts around $3,000 for light work
Mid-level renovationKitchen and bath updates, new flooring, some layout changesAbout $52,000 on average for a 1,250 to 1,600 sq ft home
Complete renovationGut work, new systems, layout changes, premium finishesUp to about $190,000 and beyond; premium finishes can exceed $150 per sq ft

Local labor, permitting and material costs, plus wind and flood requirements, can push Palm Beach County projects above national averages. A few budgeting rules help:

  • Fund the systems first. Electrical panels, plumbing and HVAC aren’t glamorous, but they’re far cheaper to replace while walls are open. Angi notes that older homes often start around $100,000 for this reason.
  • Inspect before you budget. In older homes, a camera inspection of the drain lines and a look at the electrical panel can prevent the most common mid-project surprises.
  • Hold a contingency. Set aside 10 to 20 percent for conditions you can’t see until demolition.
  • Use allowances wisely. If finishes aren’t chosen yet, make sure allowances in the contract are realistic for what you actually want.

Step 2: Know the rules for your property

Your building department

Permits come from your city’s building department or, in unincorporated areas, Palm Beach County’s Planning, Zoning and Building Department. Larger renovations usually need building, electrical, plumbing and mechanical permits, and some need engineered plans.

Condo and HOA approvals

Most condo associations and many HOAs require approval before work starts. Expect to submit plans, your contractor’s license and insurance certificates, and to follow rules on work hours, elevator use, parking and debris removal. Board review can take weeks, so it belongs on the schedule from day one. We cover this in detail on our permits and HOA/condo approvals page.

Flood zones and the FEMA 50 percent rule

If your home is in a FEMA Special Flood Hazard Area, a renovation that costs 50 percent or more of the structure’s value counts as a “substantial improvement.” When that happens, the whole building has to meet current flood requirements, which can mean elevating it or using flood-resistant materials. Many communities track improvement costs cumulatively, for example over a one-year period (City of Miami Beach). Check your flood zone early and ask your building department how it calculates the threshold.

Wind and hurricane requirements

All of unincorporated Palm Beach County lies in the wind-borne debris region (Palm Beach County PZB). When you replace exterior windows and doors, they need to meet current impact and wind-load requirements, and roof work has its own requirements. Build those upgrades into the plan instead of treating them as extras.

A new building code at the end of 2026

The 9th Edition (2026) Florida Building Code takes effect December 31, 2026 (ICC). If your permit application will be submitted around that date, ask your contractor which edition your plans will be reviewed under.

Step 3: Hire the right team

A whole-home renovation touches structure, electrical, plumbing and mechanical systems, so it needs licensed contractors. A general or building contractor coordinates every trade, pulls the permits and is responsible for the work passing inspection.

Before you sign:

  • Verify the license with the state’s Verify a License tool.
  • Get proof of liability and workers’ compensation insurance.
  • Make sure the contract spells out scope, allowances, schedule, payment draws and change-order pricing.
  • Confirm the contract includes Florida’s Homeowners’ Construction Recovery Fund notice, required for contracts over $2,500 (Fla. Stat. 489.1425).
  • Expect a recorded Notice of Commencement for contracts over $5,000 (Fla. Stat. 713.135), and collect lien releases as you pay.

Be cautious if anyone suggests you pull the permits yourself as an owner-builder. That makes you legally responsible for the work and for supervising the trades.

Step 4: Design and choose finishes before construction

The single best way to protect your schedule is to make decisions before demolition. That includes:

  • Final layouts for kitchens, baths and any walls that move
  • Cabinets, countertops, tile, flooring, plumbing fixtures and lighting
  • Appliances, with model numbers
  • Windows and doors, if they’re being replaced
  • Electrical needs: panel capacity, outlets, lighting plan, low-voltage and smart-home wiring

Order long-lead items early. Custom cabinetry can take months, and impact windows and doors often have their own lead times.

Step 5: Construction, phase by phase

Most whole-home renovations follow the same order:

  1. Protection and demolition. Floors, cabinets you’re keeping and HVAC returns are protected before anything comes out.
  2. Discovery. Open walls and floors reveal the real condition of plumbing, wiring, framing and subfloors. This is where the contingency earns its keep.
  3. Structural work. Walls, beams and openings are framed and inspected.
  4. Rough-in. Plumbing, electrical and HVAC are run, then inspected before walls close.
  5. Insulation and drywall. Walls are closed, taped, finished and primed.
  6. Interior finishes. Cabinets, tile, flooring, trim, doors and paint go in, generally from the ceiling down.
  7. Fixtures and appliances. Plumbing fixtures, lighting, hardware and appliances are installed and connected.
  8. Final inspections and punch list. Every permit is closed, and you walk each room with your contractor.

How long does a whole-home renovation take?

Angi puts the average whole-house renovation at two to eight months (Angi). Where your project falls depends on:

  • Scope. Cosmetic work on occupied rooms moves faster than gut work with layout changes.
  • Approvals. Condo boards and plan review can add weeks before construction starts.
  • Lead times. Custom cabinets, windows and special-order tile set the pace.
  • Inspections. Each phase waits on inspection before the next one begins.
  • Weather. Exterior work during hurricane season needs flexible scheduling.

Should you live at home during the renovation?

For phased projects, many families stay and move between finished and unfinished areas. For gut renovations, moving out is often faster and safer. Angi estimates alternative housing at about $2,000 to $10,000 or more (Angi). Consider dust, noise, days without water or power, and the safety of kids and pets when you decide.

How North2South manages whole-home renovations

North2South Renovations is a licensed Florida contractor (CBC1269429) serving Boca Raton, Delray Beach, Boynton Beach and the rest of Palm Beach County. On a whole-home project, we coordinate design, permits, condo and HOA approvals, and every trade under one schedule, with one point of contact from the first walkthrough to the final inspection.

Learn more about our whole-home renovations and general contracting in Palm Beach County, or see how we approach kitchen remodeling and bathroom remodeling. When you’re ready, request a free in-home estimate.

Frequently Asked Questions

How much does a whole-home renovation cost in Palm Beach County?

It depends heavily on scope. National cost guides put averages around $15 to $60 per square foot, with premium finishes above $150 per square foot and complete renovations reaching $190,000 or more. Local labor, permits and wind and flood requirements can push South Florida projects higher, so a scoped estimate is the only reliable number.

How long does a whole-home renovation take?

Angi puts the average at two to eight months of work. Design, condo or HOA approval and permitting come first and can add several weeks.

Can I stay in my house during a whole-home renovation?

Often, yes, if the work is phased. For gut renovations, moving out is usually faster and safer. Plan for dust, noise and days without water or power.

What is the FEMA 50 percent rule?

In a FEMA flood zone, if renovation costs reach 50 percent or more of the structure’s value, the work counts as a substantial improvement and the whole building must meet current flood standards. Many communities add up improvement costs over a set period, so check with your building department early.

Do I need a general contractor for a whole-home renovation?

Structural, electrical, plumbing and mechanical work must be done by licensed contractors, and a general or building contractor coordinates them and pulls the permits. Florida has an owner-builder exemption, but it makes you legally responsible for the work and for supervising the trades.

Is it cheaper to renovate or rebuild?

Usually renovating costs less, but not always. Major structural problems, flood-zone requirements under the 50 percent rule, or a complete layout change can make rebuilding competitive. Get the condition of the house assessed before you decide.

References

  1. How Much Does It Cost to Renovate a House?, Angi.
  2. FEMA 50% Rule, City of Miami Beach Building Department.
  3. Wind Speed Maps, Palm Beach County Planning, Zoning and Building.
  4. Florida Adopts New Building Codes, ICC-NTA, September 2026.
  5. Florida Statutes 489.1425, Florida Senate.
  6. Florida Statutes 713.135, Florida Senate.
  7. How to Verify a License, Florida Department of Business and Professional Regulation.
[googlesitekit-end-of-content]

Ready to talk through your remodel?

Tell us what you want to change. We will walk the home with you, explain what the job involves, and give you a written estimate you can actually compare.

Colby Matheny, owner of North2South Renovations, standing beside the company’s wrapped truck in a client’s driveway